Professor
Phone: 027-87557742
Email: lixinyu@hust.edu.cn
Academic Areas: Intelligent optimization methodswiththeir applications
Xinyu Li received his Ph.D. degree from Huazhong University of Science and Technology (HUST), Wuhan, China, in 2009. He has been an associate professor at HUST since 2013. He is the member of state key laboratory of digital manufacturing equipment and technology.His research interests include intelligence optimization algorithmswith their applications. He has published 27 SCI-indexed papers.
Academic Degrees
2005/09-2009/12 HuazhongUniversity of Science and Technology Doctor
Professional Experience
2010/04 - 2013/10: Lecturer, School of Mechanical Science and Engineering, Huazhong University of Science and Technology.
2013/11 -: Associate professor, School of Mechanical Science and Engineering, Huazhong University of Science and Technology.
Selected Publications
(1)Book
1.Quanke Pan, Liang Gao, Xinyu Li. Flow shop scheduling and optimization algorithm. Huazhong University of Science and Technology Press, 2013.(in Chinese)
(2)Journal
1.Li X Y, Gao L, Shao X Y. An active learning genetic algorithm for integrated process planning and scheduling. Expert Systems with Applications, 2012, 39: 6683-6691.
2.Li X Y, Gao L, Li W D. Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling. Expert Systems with Applications, 2012, 39: 288-297.
3.Li X Y, Gao L, Wen X Y. Application of an efficient modified particle swarm optimization algorithm for process planning. International Journal of Advanced Manufacturing Technology, 2013, 67: 1355-1369.
4.Li X Y, Zhang C Y, Gao L, Shao X Y. An agent-based approach for integrated process planning and scheduling. Expert Systems with Applications, 2010, 37(2): 1256-1264.
5.Li X Y, Gao L, Shao X Y, Zhang C Y. Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Computers & Operations Research, 2010, 37(4): 656-667.
6.Li X Y, Shao X Y, Gao L. An effective hybrid algorithm for integrated process planning and scheduling. International Journal of Production Economics, 2010, 126: 289-298.
7.Li X Y, Shao X Y, Gao L. Optimization of flexible process planning by genetic programming. International Journal of Advanced Manufacturing Technology, 2008, 38: 143-153.
8.Shao X Y, Li X Y, Gao L, Zhang C Y. Integration of process planning and scheduling - a modified genetic algorithm-based approach. Computers & Operations Research, 2009, 36(6): 2082-2096.
9.Gao L, Huang J D, Li X Y*(通讯作者). An effective cellular particle swarm optimization for parameters optimization of a multi-pass milling process. Applied Soft Computing, 2012, 12: 3490-3499.
10 .Gao L, Qian W R, Li X Y*(通讯作者). Application of memetic algorithm in assembly sequence planning. International Journal of Advanced Manufacturing Technology, 2010, 49: 1175-1184.
Awards and Honors
2013, First Prize for Natural Sciences of the Ministry of Education (rank 4).
Courses Taught
《Operations Research》
《Scheduling Theory, Algorithm and Systems》
Centers/Programs
(1)Principle Investigator
Research on Integrated Process Planning and Scheduling for Discrete Manufacturing Systems, Project number: 51375004, NSFC, 2014.01-2017.12.
Research on the Theory, Methods of the Integrated Process Planning and Scheduling Problem with Its Extension, Project number: 51005088, NSFC, 2011.01-2013.12.
(2)Principle Participant
Research of Data Driven Analysis and Decision Making Methodology for Smart Factory, Project number: 51435009, Grand Project of NSFC, 2015.01-2019.12.